Service Performance
- Distribution and Power Transformer Preventive Maintenance and Overhauling.
- Distribution and Power Transformers Internal Inspection.
- Oil Filling & Treatment, Drying-Out for new power transformer installation.
- On Line Hot Oil Circulation for excessive Moisture Content Contamination complete with On Line ” Vaisala”
- Removing, replacing and installation for used or new Distribution and Power Transformers.
- Visual inspection for Power Plants large industries etcs.
- “MR” & “ABB” On Load Tap Changer Inspection and replacing by trained personnel.
- On site “ABB” or “MR” On Load Tap Changer providing and installation by qualified staff.
- Acceptance, Electrical and Commissioning Test.
- DC High-Potential Test.
- Electrical Test.
- Transformer oil characteristic testing by EGAT and Re Support Laboratory.
- Medium Voltage Main switchboard Capacitor Bank and accessory Preventive Maintenance, Repairing and Replacing.
- Infrared (IR) Thermographic Scanning.
- “Dow Corning-USA” Sylgard High Voltage Insulator Coating.
- Lubricating Oil Treatment to meet ASTM Standard including characteristic testing.
- Clamp-on Harmonic Measurement.
- Concrete Pole, HV-LV Transmission Line, Cables, Transformer, MDB and Capacitors for medium voltage installation and replacing.